DO NOT CONTACT ME IF YOU CANT DO IT.. NO TIME WASTER
In the attached final project, please assume the role of a project engineer as part of the team when completing the final project.
and complete the constraints. please see the attachments for details.
. Only assume the role of a project engineer
Project complexities/constraints:
· The regional soil consists of a blend of deep, well-drained, silty soils and clays. During
footing excavation, the subsurface water level was not reached.
· The owner has set a completion date of December 2023.
· It is critical that the contractor provide a safe environment for all the workers on site. The owner wants to have an elaborated plan on zero accident strategy by the selected general contractor.