Write a description and analysis of a specific construction project. This can be one from literature or one from the personal experience. The project can either be one that was completed or can be one that was investigated and subsequently shelved or scrapped. Examples of projects selected in the past include the Scottish Parliament building, the ‘redevelopment’ of Wembley stadium, and Hampden Park.
The analysis should address the question ‘can the project be classified as a success or as a disaster?’
The Report should focus on the following where they are relevant:
The incidence of cost and time escalation.
The procurement issues for the project.
The degree that the project will be affected by the local economy.
The extent to which the project will impact on the local economy including supply chains.
The degree to which technological innovation has impacted on the project.
The report should contain location maps, diagrams, and if possible, pictures of the project.
I want the report to be on Heathrow Airport Terminal 5. 2500 words.
Report Sections
[1]
Introduction
[5%]
[2]
Time/Cost Escalation
[15%]
[3]
Procurement Issues
[15%]
[4]
Impact on the Local Economy
[15%]
[5]
Effect of the Economy and Supply Chains
[15%]
[6]
Technological Impact
[15%]
[6]
Overall coherence of report
[10%]
[7]
Slide Presentation
[10%]